Design & Build 18-Classroom Primary Academy
New-Build Primary School Construction for a Major Housing Development
Design and build construction of a new primary school on a 6-acre site within a major housing development, delivered in time for occupation at the start of the academic year.
The project comprised a single-storey steel frame structure with brick and glazed wall sections, an insulated sheet roof, and fully landscaped grounds, creating a modern educational facility designed to serve a growing community.
project delivery
Persimmon Homes engaged TCi to develop the 6-acre site and deliver an impressive new primary school facility comprising two wings and a central atrium incorporating a school hall and catering facilities.
Design development was undertaken in close consultation with both the client and end user, the academy trust. Clearly defined objectives and excellent communication enabled the design process to progress efficiently, providing an advantageous lead-in to the procurement and construction planning stages.
Construction commenced on the brownfield site in October 2022. Located within an active housing development, the project required careful planning and coordination to manage site access and logistics. Site setup and groundworks began immediately, with the building footprint established quickly before the steel framework started to arrive on site.
Although inclement winter weather created challenges during the construction programme, the project team responded effectively and returned works to programme quickly, maintaining momentum throughout the build.
Regular site visits were accommodated throughout construction for key stakeholders, including the incoming headteacher and representatives of the academy trust. These visits helped maintain excellent communication with both the client and end user while providing visibility of project progress.
project completion
The completed single-storey, steel-framed primary school features an open-plan design with 18 classrooms, a spacious assembly hall, a welcoming reception area, and a central atrium. Fully landscaped grounds provide an attractive external environment for pupils and staff alike.
Designed to maximise natural daylight, the building incorporates full-height corridors, windows positioned high within the asymmetrical roof apex, and glazed internal partitions. This approach allows natural light to flow throughout communal spaces and into the well-appointed classrooms, creating a bright and welcoming learning environment.
Achieving a BREEAM ‘Very Good’ rating was a key project requirement. This was successfully delivered through innovative building design and the incorporation of a large solar photovoltaic array.
The school provides facilities for nursery and reception pupils through to Year 2 and includes a large playing field alongside a dedicated Forest School area. St John’s CE Academy officially opened in September 2023 and is set to become a focal point at the heart of the new Wellington Gate community.
Project handover
The completed single-storey, steel-framed primary school features an open-plan design with 18 classrooms, a spacious assembly hall, a welcoming reception area, and a central atrium. Fully landscaped grounds provide an attractive external environment for pupils and staff alike.
Designed to maximise natural daylight, the building incorporates full-height corridors, windows positioned high within the asymmetrical roof apex, and glazed internal partitions. This approach allows natural light to flow throughout communal spaces and into the well-appointed classrooms, creating a bright and welcoming learning environment.
Achieving a BREEAM ‘Very Good’ rating was a key project requirement. This was successfully delivered through innovative building design and the incorporation of a large solar photovoltaic array.
The school provides facilities for nursery and reception pupils through to Year 2 and includes a large playing field alongside a dedicated Forest School area. St John’s CE Academy officially opened in September 2023 and is set to become a focal point at the heart of the new Wellington Gate community.
project handover
Successful handover and Ofsted approval were achieved following completion of commissioning activities and the provision of all required operation and maintenance documentation, warranties, and contractual defect period information.
A topping-out ceremony was held during the project with representatives from the local community and school staff in attendance. Throughout the construction programme, monthly senior engagement tours were attended by the incoming headteacher and members of the client team, supporting continued stakeholder engagement and project transparency.