Industrial office facility
Office, reception and cafeteria facilities are housed across two floors, providing an impressive glass frontage for the EMEA headquarters of this global electronics specialist.
Industrial office facility Read More »
Projects completed by TCi including case studies and news
Office, reception and cafeteria facilities are housed across two floors, providing an impressive glass frontage for the EMEA headquarters of this global electronics specialist.
Industrial office facility Read More »
Property of significant historical interest requiring sensitive restoration techniques Hidden within the grounds of a busy holiday complex, the derelict country home was saved from demolition by a preservation order and was in dire need of structural repairs. Phase 1 The villa was originally built in the 1820s and has remained relatively unaltered since the
Grade II listed manor house repair Read More »
New-build construction of an 18 classroom C of E primary school as part of a major housing development, for occupation at the start of the 2023 academic year.
Design & build steel frame structure with brick and glazed wall sections, insulated sheet roof and landscaped grounds.
Chilton Bridge, a former residential school within substantial grounds, required extensive refurbishment to meet educational standards and reopen as a facility for students with SEMH needs.
Chilton Bridge Restoration & refurbishment Read More »
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Hinkley Point C site accommodation buildings Read More »
Refurbishment of an existing storage facility (circa 800m2) to provide a mixture of ISO 7, Class C and D clean room space Design stage (PCSA) Working with the client and design team, TCi engaged in an extensive design process from RIBA stage 3 under a JCT Design & Build contract. To meet user requirements within
Expansion of manufacturing and research & development laboratories Read More »
Wash bay, hygiene room and several environmentally-controlled clean equipment storage rooms within an existing wet manufacturing area
GMP Hygiene Facility – Pharmaceutical Manufacturer Read More »
12-week programme to strip-out and refurbish an existing 200m2 production area for the Containment of Formulation Equipment
Modification works to pharmaceutical production environment at Vectura Read More »
As part of multi-phase refurbishment works for Devon & Cornwall Police, by TCi construction WORKS, a brand-new public reception at Middlemoor now welcomes visitors to the site. An impressive glass entrance with automatic doors welcomes visitors into a light and airy waiting area. The centrepiece is a bespoke, 5-metre, one-piece Corian® reception counter with a
Modern and stylish new reception for police headquarters Read More »
440 capacity site accommodation complex over 2 floors delivered to achieve critical programme With refurbishment works complete, the East Office Annexe (EOA) at Hinkley Point C in Somerset is now ready to be occupied by the team responsible for members of the team working to construct the UK’s first new nuclear power station in a
Office fit-out helps to keep progress on-track at Hinkley Point C Read More »