Industrial office facility
Office, reception and cafeteria facilities are housed across two floors, providing an impressive glass frontage for the EMEA headquarters of this global electronics specialist.
Industrial office facility Read More »
Office, reception and cafeteria facilities are housed across two floors, providing an impressive glass frontage for the EMEA headquarters of this global electronics specialist.
Industrial office facility Read More »
New-build construction of an 18 classroom C of E primary school as part of a major housing development, for occupation at the start of the 2023 academic year.
Design & build steel frame structure with brick and glazed wall sections, insulated sheet roof and landscaped grounds.
Construction of 29 industrial units on a 2.5 acre site for commercial property developer ARLA Holdings Ltd
TCi construction WORKS was appointed as principal contractor to design and build the estate, following successful planning application and environmental preparation.
Industrial Development Read More »
TCi (GB) Ltd was approached to deliver a high-specification Cat A & Cat B fit-out to newly acquired office space for property agents, Savills The client was in the process of expanding into larger premises and looking to create an innovative and inspiring workspace as a potential model for future refurbishments within their estate. The
Turnkey office fit-out Read More »
Somerset Passenger Solutions is the principal provider of transport to-and-from Europe’s largest construction site The service operates from park and ride facilities at Bridgwater, with operations headquartered within a purpose-built modular building delivered by TCi construction WORKS. TCi successfully tendered for the project to design and build a fully functioning office, induction and welfare facility
Modular build and fit-out for Hinkley Point C park & ride Read More »
TCi construction WORKS – part of the TCi (GB) Ltd family – was selected by EDF Energy to provide an onsite Interim Fire Facility building at its Hinkley Point C site. The building is for the temporary use of the emergency services as a base whilst a permanent facility is completed at the Somerset site. The
Temporary modular facility for Hinkley Point C fire service Read More »