Hinkley Point C site accommodation buildings
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Refurbishment of an existing storage facility (circa 800m2) to provide a mixture of ISO 7, Class C and D clean room space Design stage (PCSA) …
Wash bay, hygiene room and several environmentally-controlled clean equipment storage rooms within an existing wet manufacturing area
The specialist construction team was selected to join finalists for refurbishments works at a >20,000m2 warehouse facility in Somerset.
TCi construction WORKS has a reputation for delivering high-specification, turnkey, commercial and industrial working environments for prestigious clients across a range of sectors.
12-week programme to strip-out and refurbish an existing 200m2 production area for the Containment of Formulation Equipment
440 capacity site accommodation complex over 2 floors delivered to achieve critical programme With refurbishment works complete, the East Office Annexe (EOA) at Hinkley Point …
TCi operates within both private and public sectors and has consistently delivered projects in highly regulated industries including nuclear, pharmaceutical and healthcare.
Works included a new roof, complete M&E strip-out design & installation with safety lighting, tannoy system and communication services, construction of 270,000cuft (7,500m3) humidity and temperature-controlled storage, vehicle extract and air management systems, creation of office and staff accommodation areas and the installation of racking and storage facilities.
Construction of 29 industrial units on a 2.5 acre site for commercial property developer ARLA Holdings Ltd
TCi construction WORKS was appointed as principal contractor to design and build the estate, following successful planning application and environmental preparation.