Hinkley Point C site accommodation buildings
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Hinkley Point C site accommodation buildings Read More »
Projects completed by TCi including case studies and news
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Hinkley Point C site accommodation buildings Read More »
Refurbishment of an existing storage facility (circa 800m2) to provide a mixture of ISO 7, Class C and D clean room space Design stage (PCSA) Working with the client and design team, TCi engaged in an extensive design process from RIBA stage 3 under a JCT Design & Build contract. To meet user requirements within
Expansion of manufacturing and research & development laboratories Read More »
Wash bay, hygiene room and several environmentally-controlled clean equipment storage rooms within an existing wet manufacturing area
GMP Hygiene Facility – Pharmaceutical Manufacturer Read More »
12-week programme to strip-out and refurbish an existing 200m2 production area for the Containment of Formulation Equipment
Modification works to pharmaceutical production environment at Vectura Read More »
440 capacity site accommodation complex over 2 floors delivered to achieve critical programme With refurbishment works complete, the East Office Annexe (EOA) at Hinkley Point C in Somerset is now ready to be occupied by the team responsible for members of the team working to construct the UK’s first new nuclear power station in a
Office fit-out helps to keep progress on-track at Hinkley Point C Read More »
Works included a new roof, complete M&E strip-out design & installation with safety lighting, tannoy system and communication services, construction of 270,000cuft (7,500m3) humidity and temperature-controlled storage, vehicle extract and air management systems, creation of office and staff accommodation areas and the installation of racking and storage facilities.
Distribution Warehouse Refurbishment Read More »
Construction of 29 industrial units on a 2.5 acre site for commercial property developer ARLA Holdings Ltd
TCi construction WORKS was appointed as principal contractor to design and build the estate, following successful planning application and environmental preparation.
Industrial Development Read More »
TCi (GB) Ltd was approached to deliver a high-specification Cat A & Cat B fit-out to newly acquired office space for property agents, Savills The client was in the process of expanding into larger premises and looking to create an innovative and inspiring workspace as a potential model for future refurbishments within their estate. The
Turnkey office fit-out Read More »
Using offsite prefabrication techniques enabled the project to be extremely efficient in terms of material waste and production resources, also reducing vehicle movements significantly.
TCi construction WORKS has been engaged in site-wide refurbishment and construction project for a major OTC pharmaceuticals producer. The project includes the conversion of several production areas into a large-scale dry manufacture and packing environment with three main zones. Preparation and delivery The entire project was delivered within a live, GMP factory environment, protected by
GMP Pharmaceutical Facility Read More »