Hinkley Point C site accommodation buildings
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Hinkley Point C site accommodation buildings Read More »
Modular offsite prefabrication, took place within a controlled manufacturing environment, providing enhanced safety and efficiency
Hinkley Point C site accommodation buildings Read More »
Refurbishment of an existing storage facility (circa 800m2) to provide a mixture of ISO 7, Class C and D clean room space Design stage (PCSA) Working with the client and design team, TCi engaged in an extensive design process from RIBA stage 3 under a JCT Design & Build contract. To meet user requirements within
Expansion of manufacturing and research & development laboratories Read More »
Wash bay, hygiene room and several environmentally-controlled clean equipment storage rooms within an existing wet manufacturing area
GMP Hygiene Facility – Pharmaceutical Manufacturer Read More »
Works included a new roof, complete M&E strip-out design & installation with safety lighting, tannoy system and communication services, construction of 270,000cuft (7,500m3) humidity and temperature-controlled storage, vehicle extract and air management systems, creation of office and staff accommodation areas and the installation of racking and storage facilities.
Distribution Warehouse Refurbishment Read More »
Construction of 29 industrial units on a 2.5 acre site for commercial property developer ARLA Holdings Ltd
TCi construction WORKS was appointed as principal contractor to design and build the estate, following successful planning application and environmental preparation.
Industrial Development Read More »
TCi construction WORKS has been engaged in site-wide refurbishment and construction project for a major OTC pharmaceuticals producer. The project includes the conversion of several production areas into a large-scale dry manufacture and packing environment with three main zones. Preparation and delivery The entire project was delivered within a live, GMP factory environment, protected by
GMP Pharmaceutical Facility Read More »
Designed to supply canteens and restaurants across Europe’s largest construction site, the Central Production Kitchen will be required to produce up-to 10,000 meals per day The high specification, 10,000sqft food production facility at Junction 24 in Bridgwater is a bespoke, high capacity food processing facility. It was built to be operated by Somerset Larder, a
Central Production Kitchen – Nuclear New Build Site Read More »
Somerset Passenger Solutions is the principal provider of transport to-and-from Europe’s largest construction site The service operates from park and ride facilities at Bridgwater, with operations headquartered within a purpose-built modular building delivered by TCi construction WORKS. TCi successfully tendered for the project to design and build a fully functioning office, induction and welfare facility
Modular build and fit-out for Hinkley Point C park & ride Read More »
TCi (GB) Ltd has been engaged more than two years in the site-wide refurbishment and construction of clean-room GMP manufacturing and laboratory facilities for a major OTC pharmaceuticals producer. To date, works have included: Project Delivery Throughout the manufacturing facility, techniques have been developed to provide a hygienic and easy to maintain, continuous scheme of
GMP Pharmaceutical Manufacturing Facility Refurbishment Read More »
Having been based at Pottington for nearly 60 years, Textile Manufacturer CQC Ltd recently acquired a new site in Roundswell and relocated on 12th June after an extensive refurbishment from TCi construction WORKS CQC outlined the requirement to TCi construction WORKS. Jim Capron, Operations Manager worked with the specification to produce a detailed programme to
CQC Ltd – Barnstaple Headquarters Read More »